Skip to article
IES North EastApplied curriculum

A governed employer project bank for North East

Turn real regional engineering problems into safe, teachable work that returns value to partners.

Reading time
10 minute read
Evidence
5 primary sources
Reviewed
15 July 2026
Next review
15 January 2027
0% read
Text 100%
In 90 seconds

Start here

Use the short route now, then open the evidence or practical sections when you need more depth.

What is changing?Five missions

The ten-year North East Local Growth Plan is organised around opportunity, place, inclusive growth, green energy and global trade missions.

Why it matters for further educationCurriculum decisions need evidence

Turn real regional engineering problems into safe, teachable work that returns value to partners.

What to do this termBegin with one programme

Invite bounded regional problems

Growth plan
Five missions

The ten-year North East Local Growth Plan is organised around opportunity, place, inclusive growth, green energy and global trade missions.

Battery project
15.8 GWh planned capacity

Capacity stated by the National Wealth Fund for AESC's Sunderland project in May 2025. It is a project figure, not a forecast of FE demand.

LSIP geography
Two specified areas

Skills England lists separate North East and Tees Valley LSIP areas, each with its own designated employer representative body and strategic authority.

Governed project route

Protect authenticity, safety and learning

Employers contribute real problems. Educators retain responsibility for scope, assessment, inclusion and learner safety.

01Invite a problem
02Screen and scope
03Deliver learning
04Return value
How this resource is organised

Published evidence reports what sources say. IES analysis explains the curriculum significance. IES recommendations are professional judgements for providers to test locally.

01
Published evidence

The North East engineering context

The published picture

Automotive electrification, batteries, offshore energy, process manufacturing and space-linked technology form a connected technical economy. In this applied curriculum guide, the test is whether that context changes a specific learner decision.

Automotive manufacturing remains a highly visible anchor. Nissan's Sunderland operation and the battery supply chain around it have made electrification a practical regional issue rather than a distant technology forecast. In May 2025 the National Wealth Fund announced financial guarantees within a financing package for AESC's new Sunderland battery plant. That announcement described planned capacity of 15.8 GWh and more than 1,000 direct jobs. These figures describe the project at announcement, not a guaranteed annual recruitment profile, so colleges should validate live demand before changing enrolment targets. For this applied curriculum topic, curriculum relevance matters more than the prominence of the organisation or announcement.

What the evidence supports

Skills England's July 2026 register divides the North East statistical region between two LSIP specified areas: North East, covering County Durham, Tyne and Wear and Northumberland, and Tees Valley, covering Darlington, Hartlepool, Middlesbrough, Redcar and Cleveland, and Stockton-on-Tees. LSIPs are employer-led statements of need. They should be read alongside programme-level evidence such as apprenticeship starts, destination records, employer project briefs, vacancy task analysis and the experience of current technicians. LSIP priorities can establish direction; they do not remove a college's responsibility to test the level, location and timing of demand. The practical applied curriculum question is what a provider should teach, sequence, resource or verify differently.

02
IES analysis

Named regional application

Why this matters

CPI, supply-chain SMEs and larger automotive, energy and process organisations can contribute different scales of problem. Suitable briefs might involve reducing a simulated process deviation, improving a maintenance handover or comparing inspection strategies. Battery recipes, production parameters and operational plant data should not enter a public bank. Recreated datasets can preserve the engineering decision while protecting the contributor.

03
Try this in practice

Collect authentic problems without outsourcing curriculum

How to use this

Employers in North East can contribute recurring inefficiencies, design constraints, maintenance questions, quality issues and communication challenges. They should not be expected to write assignments. A curriculum team must shape a problem around learner level, taught knowledge, equipment, time and valid assessment. Authenticity comes from credible constraints and decisions, not from exposing learners to commercial risk. Apply this test to the relevant North East travel-to-work area, not to the regional label in isolation.

Every proposal needs screening for safety, personal data, commercial confidentiality, export controls, intellectual property and unrealistic expectations. Operational data should be anonymised or recreated where necessary. The agreement must state that learner outputs are developmental and are not certified engineering consultancy. Any idea intended for operational use requires the employer's normal professional verification. For North East, local destination and employer evidence must confirm whether this is material to the programme.

Delivery considerations

A balanced bank should include small and medium-sized firms as well as major names. Cluster organisations, chambers, research centres and provider networks can gather problems through a standard brief. Record provenance and review dates so a project does not continue presenting an outdated process as current practice. The North East application should be dated, geographically bounded and reviewed when the underlying evidence changes.

04
IES analysis

What this means for FE engineering

Why this matters

The strongest curriculum response is a common engineering core with visible regional applications. Learners need measurement, engineering drawing, materials, electrical and mechanical principles, fault diagnosis, safe isolation, technical communication and disciplined problem solving before specialising. Battery assembly, offshore maintenance or process control should provide authentic contexts for those capabilities, not become narrow training for one employer's present equipment. In this applied curriculum guide, the test is whether that context changes a specific learner decision.

Technical currency needs to be planned as a system. A short employer visit has limited value unless staff convert it into changed examples, practical work or assessment. Colleges can distribute updating across teams: one member develops battery safety, another industrial networks, another condition monitoring, then the team tests and shares the resulting teaching. Employer specialists can challenge authenticity without being asked to design an entire qualification. For this applied curriculum topic, curriculum relevance matters more than the prominence of the organisation or announcement.

Curriculum implications

Map the project to intended learning before launch. Teach prerequisite concepts, provide staged review points and assess individual understanding where teamwork is used. Employers can offer a briefing and response, while teachers retain responsibility for support, assessment and fairness. Apply this test to the relevant North East travel-to-work area, not to the regional label in isolation.

Return value through a concise presentation, options appraisal, prototype evidence or technical reflection. Capture what the employer learned about education as well as what learners learned about work. Repeat only when educational value justifies coordination load. For North East, local destination and employer evidence must confirm whether this is material to the programme.

Questions to test

Use a stage gate before a North East project reaches learners: educational fit, information and legal review, safety and resources, assessment design, employer confirmation, then release. Give every project an expiry date. A later cohort should not inherit a brief after the process, contact or commercial context has changed. The project bank owner should be able to pause or withdraw material immediately. Apply this test to the relevant North East travel-to-work area, not to the regional label in isolation.

Evaluate authenticity through decisions and constraints, not scale. A short maintenance handover with incomplete evidence can be more educational than an ambitious design challenge that learners cannot validate. Preserve space for iteration and failure within safe limits. At closure, record the employer's response, learner evidence, staff workload and specific amendments needed before reuse. For North East, local destination and employer evidence must confirm whether this is material to the programme.

05
Try this in practice

Delivery workshop

How to use this

Use a two-stage submission. The employer first describes a problem, affected process, desired decision, available artefacts and information restrictions. A teacher then writes the learner brief, prerequisites, safe boundary, staged outputs and assessment status. The employer approves technical plausibility but does not control grades. In North East, accept problems from SMEs through a short facilitated conversation when a written form would exclude them. Record organisation type, locality, contributor role and date without publishing details that create commercial or security risk. Apply this test to the relevant North East travel-to-work area, not to the regional label in isolation.

Apply a formal screen before release. Check hazards, personal data, confidentiality, intellectual property, export control, safeguarding, accessibility, equipment demand and whether the expected output resembles professional consultancy. Replace live operational data with a synthetic or anonymised set when possible. State that learner outputs are developmental and require the employer's usual qualified verification before any operational use. Give project owners authority to pause publication immediately if circumstances or information status change. This boundary protects the learner, employer and provider without removing authentic technical decisions. For North East, local destination and employer evidence must confirm whether this is material to the programme.

Delivery considerations

Review the portfolio each term. Count projects by discipline, level, employer size, geography and type of decision, then identify over-representation. Include maintenance, quality, manufacture, operations, design, communication and improvement rather than filling the bank with open-ended product design. Sample learner work for individual understanding where teams are used. Return a concise outcome to the contributor and log workload as well as educational value. A sustainable North East bank reuses well-governed structures while refreshing evidence and constraints; it does not depend on continuously finding dramatic new challenges. The North East application should be dated, geographically bounded and reviewed when the underlying evidence changes.

06
Try this in practice

Quality tests and safeguards

How to use this

Create a portfolio view across the North East bank. Check disciplines, levels, locations, employer sizes, environmental questions and the range of engineering decisions. Ten versions of a design challenge do not provide a balanced applied curriculum. Include maintenance, manufacture, quality, operations, communication and improvement, and ensure projects are accessible to learners who cannot travel to a partner site. Apply this test to the relevant North East travel-to-work area, not to the regional label in isolation.

Publish a concise provenance note on each project: contributor type, date, adaptation made by the provider and information status. Do not imply endorsement when an employer supplied only the initial problem. If learners' ideas are shared externally, obtain appropriate consent and credit without revealing assessment or personal data. A trustworthy bank protects contributors and learners while retaining the texture of real work. For North East, local destination and employer evidence must confirm whether this is material to the programme.

07
IES analysis

A deeper curriculum test

Why this matters

Prepare contributors for learner variability. A strong project has extension without making the core inaccessible, and checkpoints that reveal misunderstanding early. Provide a minimum viable outcome, optional depth and an evidence pack that does not depend on privileged workplace knowledge. This makes a North East employer problem usable across cohorts while leaving room for different justified solutions. It also helps teachers distinguish ambitious engineering thought from unmanageable project scope.

08
IES recommendation

IES position

IES position

For applied curriculum, IES recommends that North East providers treat regional intelligence as a disciplined curriculum input, not a marketing slogan. Current claims should carry a source and date; proposed activity should be identified as proposed; and local employers and learner destinations should test whether a regional signal is material to the programme.

The applied curriculum aim is not to chase every technology announcement. It is to strengthen engineering fundamentals, technical judgement and inclusive progression while making the context recognisably North East. Each change should have an owner, intended learner benefit, evidence of implementation and review point.

09
Try this in practice

Put it into practice

How to use this

Begin the applied curriculum work with one North East programme rather than a whole-department relaunch. Use the published evidence as a starting point, then add current local intelligence. Record dissent and uncertainty. A decision not to change can be legitimate when the evidence is weak, the demand is outside the learner travel area or the proposed content would displace a more durable capability.

Review applied curriculum impact in North East through learner work, staff confidence, employer feedback and progression evidence. Do not claim causation from one data point. Share what changed and what remains under review so contributors can see that their time produced a considered response.

Delivery considerations

For this applied curriculum guide, read the source list as an evidence trail, not a blanket endorsement. Check the original publication, its date, geography and definitions before reusing a figure. Corporate and investment pages establish what an organisation has announced; ONS services support statistical comparison; combined-authority plans establish public priorities. None alone proves the volume or level of local vacancies. Before acting in North East, add live provider destinations and direct employer confirmation, then preserve a dated copy of the evidence used.

At the scheduled North East applied curriculum review, test every time-sensitive statement against the original publisher and replace broken or superseded links. Record material changes in an editorial note. If a project has been delayed, reduced, completed or cancelled, update the wording rather than deleting the earlier context without explanation. Readers should be able to distinguish evidence available at publication from later developments and understand why the IES recommendation still stands or has changed.

Key points to use
  • Use a standard problem-submission form.
  • Screen legal, safety and data boundaries.
  • Name one teacher and employer owner.
  • Build prerequisite teaching and review gates.
  • Archive outcomes, feedback and the next review date.
Action studio

Build your next-step plan

Select actions as you work through them. The checklist stays in this browser session unless you print or save the page.

Plain-language glossary

Terms used in this resource

LSIP
Local Skills Improvement Plan: an employer-led assessment of skills priorities within a defined area.
Technical currency
The extent to which professional knowledge, methods, standards and practical experience remain current with workplace practice.
Evidence register

Sources and review

These links were checked during the evidence review. External pages open in a new tab and may later be updated or moved by their publisher.

  1. 01 · North East Combined AuthorityLocal Growth PlanPublished or accessed 2025. Open external source ↗
  2. 02 · UK Export FinanceAESC battery manufacturing projectPublished or accessed 2 June 2025. Open external source ↗
  3. 03 · Skills EnglandCurrent LSIP areas and designated employer representative bodiesPublished or accessed Updated 10 July 2026. Open external source ↗
  4. 04 · CPIAbout CPIPublished or accessed Accessed 15 July 2026. Open external source ↗
  5. 05 · Office for National StatisticsExplore local statisticsPublished or accessed Live statistical service. Open external source ↗

IES publication date: 15 July 2026

Evidence reviewed: 15 July 2026

Next scheduled review: 15 January 2027

Continue learning

Stay with North East

Use this evidence alongside local employer insight, learner need and professional judgement.

1,916 words · Print-friendly

Stay close to the sector

Useful updates, occasionally.

New resources, sector briefings and opportunities to contribute to IES programmes. No noise.

By joining, you ask IES to send these updates. You can stop at any time. See privacy information.